Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0168 # 03 Y:2003 | 03 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,295 | $0 | Implemented |
SU0168 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,662 | $85 | Not Implemented |
SU0168 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,037 | $227 | Implemented |
SU0168 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,579 | $9,450 | Not Implemented |
SU0168 # 07 Y:2003 | 07 | 2003 | MOVE BOILER TO MORE EFFICIENT LOCATION | $5,735 | $18,000 | Not Implemented |
OK0670 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,939 | $27,543 | Not Implemented |
OK0670 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,120 | $0 | Implemented |
OK0670 # 03 Y:2003 | 03 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $12,292 | $0 | Implemented |
OK0670 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,304 | $4,211 | Not Implemented |
OK0670 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,797 | $113,450 | Not Implemented |
OK0670 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $1,771 | $1,017 | Not Implemented |
OK0670 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $58,240 | $6,500 | Not Implemented |
AM0445 # 01 Y:2003 | 01 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,800 | $0 | Implemented |
AM0445 # 02 Y:2003 | 02 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,390 | $0 | Implemented |
AM0445 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,390 | $500 | Implemented |
AM0445 # 04 Y:2003 | 04 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $430 | $0 | Implemented |
AM0445 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $380 | $15 | Not Implemented |
AM0445 # 06 Y:2003 | 06 | 2003 | REUSE RAGS UNTIL COMPLETELY SOILED | $1,400 | $0 | Not Implemented |
AM0445 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $700 | $380 | Implemented |
BD0245 # 01 Y:2003 | 01 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $8,991 | $2,000 | Not Implemented |
BD0245 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,603 | $6,590 | Implemented |
BD0245 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,593 | $11,310 | Implemented |
BD0245 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,614 | $0 | Implemented |
BD0245 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,735 | $110 | Implemented |
BD0245 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,682 | $0 | Implemented |