Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0098 # 06 Y:1990 | 06 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,330 | $10,500 | Not Implemented |
AM0098 # 07 Y:1990 | 07 | 1990 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $1,980 | $7,700 | Implemented |
AM0098 # 08 Y:1990 | 08 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $970 | $137 | Implemented |
AM0098 # 09 Y:1990 | 09 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $695 | $700 | Implemented |
AM0098 # 10 Y:1990 | 10 | 1990 | INSTALL SET-BACK TIMERS | $500 | $1,180 | Not Implemented |
AM0098 # 11 Y:1990 | 11 | 1990 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $106 | $0 | Implemented |
AM0099 # 01 Y:1990 | 01 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $10,480 | $14,890 | Not Implemented |
AM0099 # 02 Y:1990 | 02 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $7,860 | $5,600 | Not Implemented |
AM0099 # 03 Y:1990 | 03 | 1990 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,680 | $0 | Implemented |
AM0099 # 04 Y:1990 | 04 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,330 | $3,000 | Implemented |
AM0099 # 05 Y:1990 | 05 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,710 | $1,600 | Not Implemented |
AM0099 # 06 Y:1990 | 06 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,180 | $1,200 | Implemented |
AM0099 # 07 Y:1990 | 07 | 1990 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,800 | $15,200 | Not Implemented |
AM0099 # 08 Y:1990 | 08 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,629 | $13,300 | Implemented |
AM0099 # 09 Y:1990 | 09 | 1990 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,200 | $12,390 | Not Implemented |
AM0099 # 10 Y:1990 | 10 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,416 | $400 | Implemented |
AM0099 # 11 Y:1990 | 11 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $750 | $1,060 | Not Implemented |
AM0099 # 12 Y:1990 | 12 | 1990 | INSTALL SET-BACK TIMERS | $739 | $52 | Implemented |
AM0099 # 13 Y:1990 | 13 | 1990 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $250 | $500 | Implemented |
AM0099 # 14 Y:1990 | 14 | 1990 | INSTALL SET-BACK TIMERS | $170 | $135 | Not Implemented |
AM0100 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $125 | $60 | Not Implemented |
AM0100 # 02 Y:1990 | 02 | 1990 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $232 | $900 | Not Implemented |
AM0100 # 03 Y:1990 | 03 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $170 | $187 | Implemented |
AM0100 # 04 Y:1990 | 04 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $105 | $80 | Not Implemented |
AM0100 # 05 Y:1990 | 05 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $76 | $69 | Not Implemented |