IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,853

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0195 # 13 Y:1998 13 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,375 $4,864 Not Implemented
SD0194 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,625 $5,210 Implemented
SD0194 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,551 $10,500 Not Implemented
SD0194 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,430 $450 Implemented
SD0194 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $706 $1,150 Implemented
SD0194 # 05 Y:1998 05 1998 USE OPTIMUM THICKNESS INSULATION $2,213 $1,559 Implemented
SD0194 # 06 Y:1998 06 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $3,975 $7,590 Not Implemented
SD0194 # 07 Y:1998 07 1998 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $2,400 $1,000 Implemented
SD0194 # 08 Y:1998 08 1998 USE AN AUTOMATIC PLATE PROCESSOR $4,590 $1,000 Not Implemented
SF0136 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,673 $0 Implemented
SF0136 # 02 Y:1998 02 1998 ADD AREA LIGHTING SWITCHES $860 $90 Implemented
SF0136 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $1,200 Not Implemented
SF0136 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $233 Implemented
SF0136 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,097 $5,250 Not Implemented
SF0136 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $905 Implemented
SF0136 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,456 $14,990 Implemented
SF0136 # 08 Y:1998 08 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,827 $24,062 Implemented
SF0136 # 09 Y:1998 09 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $22,785 $100 Not Implemented
SF0136 # 10 Y:1998 10 1998 $151,580 $152,960 Implemented
NV0125 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $640 $640 Implemented
NV0125 # 02 Y:1999 02 1999 UPGRADE CONTROLS ON COMPRESSORS $354 $110 Implemented
NV0125 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $158 $0 Not Implemented
NV0125 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $701 $825 Not Implemented
NV0125 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $6,789 Implemented
NV0125 # 06 Y:1999 06 1999 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $24,200 $102,400 Not Implemented