IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0452 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,969 $47,618 Not Implemented
SF0452 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,986 $6,681 Implemented
SF0452 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,913 $23,541 Not Implemented
SF0452 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $536 $2,722 Implemented
SF0452 # 07 Y:2014 07 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,802 $104,674 Not Implemented
SF0452 # 01 Y:2014 01 2014 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $13,134 $1,372 Implemented
SF0451 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,113 $0 Implemented
SF0451 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $11,085 $0 Implemented
SF0451 # 03 Y:2014 03 2014 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $37,183 $15,000 Not Implemented
SF0451 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,957 $1,853 Implemented
SF0451 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,791 $53,490 Implemented
SF0451 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,422 $6,599 Not Implemented
SF0451 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,800 $12,734 Not Implemented
SD0461 # 01 Y:2013 01 2013 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $889,050 $2,250,000 Implemented
SD0461 # 02 Y:2013 02 2013 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $857,166 $2,630,000 Not Implemented
SD0461 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,350 $106,000 Not Implemented
SD0461 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,519 $18,224 Implemented
SD0461 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,329 $3,400 Implemented
SD0461 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,607 $4,865 Not Implemented
SD0451 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,395 $14,332 Implemented
SD0451 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,815 $17,500 Not Implemented
SD0451 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,577 $2,373 Implemented
SD0451 # 04 Y:2012 04 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,240 $9,000 Not Implemented
SD0451 # 05 Y:2012 05 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $134,300 $455,000 Not Implemented
SD0448 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,239 $100 Not Implemented