IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0450 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,207 $29,505 Implemented
IA0450 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,373 $3,784 Implemented
IA0450 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $888 $2,230 Implemented
IA0450 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,759 $660 Not Implemented
IA0450 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,496 $20 Implemented
IA0450 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,382 $250 Implemented
IA0450 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $180 $150 Implemented
IA0450 # 08 Y:2010 08 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $711 $500 Not Implemented
IA0450 # 09 Y:2010 09 2010 METER WASTE WATER $794 $1,000 Not Implemented
IA0450 # 10 Y:2010 10 2010 REDUCE VENTILATION AIR $4,542 $2,000 Not Implemented
IA0450 # 11 Y:2010 11 2010 OPTIMIZE PLANT POWER FACTOR $2,499 $12,951 Not Implemented
OK0786 # 01 Y:2010 01 2010 OPERATE BOILERS ON HIGH FIRE SETTING $2,348 $24,000 Not Implemented
OK0786 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $604 Not Implemented
OK0786 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $3,410 Not Implemented
OK0786 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $0 Implemented
OK0786 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $1,491 $465 Implemented
OK0786 # 06 Y:2010 06 2010 CHECK FOR ACCURACY OF UTILITY / POWER METERS $903 $0 Implemented
OK0784 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $32,802 $10,627 Implemented
OK0784 # 02 Y:2009 02 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $26,522 $23,859 Implemented
OK0784 # 03 Y:2009 03 2009 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,003 $0 Not Implemented
OK0784 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,600 $620 Not Implemented
OK0784 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $362 $1,013 Not Implemented
OK0784 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,098 Not Implemented
OK0784 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,104 $0 Implemented
OK0784 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,788 $0 Implemented