Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1701 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $257 | $384 | Not Implemented |
UK1701 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,902 | $10,000 | Not Implemented |
UK1701 # 06 Y:2017 | 06 | 2017 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $1,690 | $2,875 | Not Implemented |
UK1701 # 07 Y:2017 | 07 | 2017 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $3,158 | $393 | Not Implemented |
UK1701 # 08 Y:2017 | 08 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,875 | $1,500 | Not Implemented |
UK1701 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,426 | $1,350 | Not Implemented |
UK1701 # 10 Y:2017 | 10 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,915 | $0 | Not Implemented |
UK1701 # 11 Y:2017 | 11 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,452 | $2,100 | Not Implemented |
UK1701 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,682 | $5,300 | Not Implemented |
UK1701 # 13 Y:2017 | 13 | 2017 | USE PHOTOCELL CONTROLS | $1,070 | $800 | Not Implemented |
UK1615 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $84,940 | $369,150 | Not Implemented |
UK1615 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,144 | $0 | Implemented |
UK1615 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,204 | $4,290 | Implemented |
UK1615 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,711 | $3,465 | Implemented |
UK1614 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $132,318 | $126,876 | Implemented |
UK1614 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,584 | $22,000 | Not Implemented |
UK1614 # 03 Y:2017 | 03 | 2017 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,324 | $4,351 | Not Implemented |
UK1614 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,502 | $20,641 | Implemented |
UK1614 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,465 | $1,800 | Not Implemented |
UK1614 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $0 | Not Implemented |
UK1614 # 07 Y:2017 | 07 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $552 | $318 | Not Implemented |
UK1614 # 08 Y:2017 | 08 | 2017 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $1,614 | $4,335 | Implemented |
UK1614 # 09 Y:2017 | 09 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $823 | $0 | Not Implemented |
UK1613 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,528 | $35,000 | Not Implemented |
UK1613 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,671 | $0 | Implemented |