Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0085 # 11 Y:2016 | 11 | 2016 | INSULATE FEEDWATER TANK | $291 | $565 | Not Implemented |
BS0078 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $174 | $187 | Not Implemented |
BS0078 # 02 Y:2016 | 02 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,270 | $8,259 | Not Implemented |
BS0078 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $415 | $162 | Not Implemented |
BS0078 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,130 | $11,073 | Not Implemented |
BS0078 # 05 Y:2016 | 05 | 2016 | DEVELOP STANDARD OPERATING PROCEDURES | $22,270 | $4,336 | Not Implemented |
BS0078 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,178 | $21,982 | Not Implemented |
BS0078 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,671 | $827 | Not Implemented |
BS0078 # 08 Y:2016 | 08 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $5,829 | $3,661 | Not Implemented |
BS0078 # 09 Y:2016 | 09 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $262 | $89 | Not Implemented |
BS0076 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $14,626 | $14,109 | Not Implemented |
BS0076 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $5,025 | $2,777 | Implemented |
BS0076 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,367 | $1,665 | Implemented |
BS0076 # 04 Y:2016 | 04 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $962 | $14 | Implemented |
BS0076 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $737 | $871 | Implemented |
BS0076 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $655 | $768 | Implemented |
BS0076 # 07 Y:2016 | 07 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $612 | $440 | Implemented |
BS0034 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $10,406 | $20,000 | Not Implemented |
BS0034 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $74,212 | $31,860 | Not Implemented |
BS0034 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,966 | $45,410 | Not Implemented |
BS0034 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,073 | $49,835 | Not Implemented |
BS0034 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,083 | $304 | Implemented |
BS0034 # 06 Y:2014 | 06 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,513 | $2,503 | Implemented |
BS0034 # 07 Y:2014 | 07 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $946 | $2,100 | Not Implemented |
BS0034 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,850 | $255 | Implemented |