Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0022 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,233 | $9,804 | Not Implemented |
UW0022 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,153 | $0 | Not Implemented |
UW0022 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,172 | $180 | Implemented |
UW0022 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $2,130 | $1,260 | Not Implemented |
UW0022 # 08 Y:2008 | 08 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,849 | $14,505 | Not Implemented |
UW0019 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $16,074 | $25,870 | Implemented |
UW0019 # 02 Y:2008 | 02 | 2008 | INSULATE BARE EQUIPMENT | $15,042 | $2,500 | Not Implemented |
UW0019 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $14,046 | $2,908 | Not Implemented |
UW0019 # 04 Y:2008 | 04 | 2008 | INSTALL OCCUPANCY SENSORS | $4,446 | $2,439 | Not Implemented |
UW0020 # 01 Y:2008 | 01 | 2008 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $115,054 | $172,581 | Not Implemented |
UW0020 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,000 | $24,547 | Not Implemented |
UW0020 # 03 Y:2008 | 03 | 2008 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $8,002 | $34,238 | Not Implemented |
UW0020 # 04 Y:2008 | 04 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $1,828 | $450 | Implemented |
UW0020 # 05 Y:2008 | 05 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $403 | $145 | Implemented |
UW0020 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $150 | $809 | Not Implemented |
UW0021 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $52,486 | $175,000 | Not Implemented |
UW0021 # 02 Y:2008 | 02 | 2008 | OPERATE BOILERS ON HIGH FIRE SETTING | $20,223 | $49,000 | Not Implemented |
UW0021 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,357 | $5,912 | Not Implemented |
UW0021 # 04 Y:2008 | 04 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,612 | $50,000 | Not Implemented |
UW0021 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,472 | $0 | Not Implemented |
UW0021 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $478 | $450 | Not Implemented |
OR0531 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $2,818 | $2,800 | Not Implemented |
OR0531 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $20,000 | $87,500 | Not Implemented |
OR0531 # 03 Y:2008 | 03 | 2008 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $2,400 | $0 | Not Implemented |
OR0531 # 04 Y:2008 | 04 | 2008 | CLEAR AND RENT EXISTING SPACE | $24,000 | $0 | Not Implemented |