IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,736

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0021 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $478 $450 Not Implemented
OR0531 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $2,818 $2,800 Not Implemented
OR0531 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $20,000 $87,500 Not Implemented
OR0531 # 03 Y:2008 03 2008 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $2,400 $0 Not Implemented
OR0531 # 04 Y:2008 04 2008 $24,000 $0 Not Implemented
OR0531 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,266 $3,000 Not Implemented
UW0018 # 01 Y:2008 01 2008 $55,734 $72,000 Not Implemented
UW0018 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,434 $34,000 Not Implemented
UW0018 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $9,391 $39,900 Not Implemented
UW0018 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $4,328 Not Implemented
UW0018 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,037 $2,775 Not Implemented
UW0011 # 01 Y:2008 01 2008 REPLACE BOILER $8,882 $23,870 Not Implemented
UW0011 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $7,908 $15,906 Not Implemented
UW0011 # 03 Y:2008 03 2008 SELL COMBUSTIBLE WASTE $5,774 $0 Not Implemented
UW0011 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $5,523 $20,275 Not Implemented
UW0011 # 05 Y:2008 05 2008 INSTALL SKYLIGHTS $5,089 $26,250 Not Implemented
UW0011 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,444 $0 Not Implemented
UW0011 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $1,476 $300 Not Implemented
UW0010 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,108 $4,160 Implemented
UW0010 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,398 $75,533 Not Implemented
UW0010 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,340 $3,000 Not Implemented
OR0526 # 01 Y:2007 01 2007 $371,000 $1,113,000 Not Implemented
OR0526 # 02 Y:2007 02 2007 $162,000 $23,000 Not Implemented
OR0526 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $70,000 $48,000 Not Implemented
OR0526 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,200 $30,000 Implemented