IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0543 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $576 $500 Not Implemented
IA0543 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $503 $70 Not Implemented
IA0543 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $323 $290 Not Implemented
UK1511 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $457,639 $1,000,000 Implemented
UK1511 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,293 $0 Not Implemented
UK1511 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $9,011 $8,260 Implemented
UK1511 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $596 $0 Implemented
MA0751 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,219 $62,146 Implemented
MA0751 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,851 $1,000 Not Implemented
MA0751 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,586 $11,250 Implemented
MA0751 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,896 $7,732 Implemented
MA0751 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,414 $500 Not Implemented
UM0463 # 01 Y:2015 01 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,052,850 $1,822,453 Not Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0463 # 03 Y:2015 03 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,674 $4,000 Not Implemented
UM0463 # 04 Y:2015 04 2015 CONVERT TO OXYFUEL BURNERS $3,052,580 $1,000,000 Not Implemented
OK0923 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,384 $754 Not Implemented
OK0923 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,094 $0 Implemented
OK0923 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $7,410 Implemented
OK0923 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,605 $98,298 Implemented
OK0923 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $8,405 Implemented
OK0923 # 06 Y:2015 06 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $440 $243 Implemented
OK0923 # 07 Y:2015 07 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,567 $16,500 Not Implemented
OK0923 # 08 Y:2015 08 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,301 $3,696 Not Implemented
OK0923 # 09 Y:2015 09 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,377 $55,000 Not Implemented