IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0507 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $1,567 $156 Implemented
SF0507 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $8,398 $3,902 Implemented
SF0507 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116,456 $172,681 Implemented
SF0507 # 06 Y:2017 06 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,369 $12,526 Implemented
SF0507 # 07 Y:2017 07 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $54,833 $312,470 Implemented
OR0689 # 01 Y:2017 01 2017 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,509 $19,000 Implemented
OR0689 # 02 Y:2017 02 2017 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $18,000 $1,495 Implemented
OR0689 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,595 $5,595 Implemented
OR0689 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $3,492 $12,558 Not Implemented
MI0320 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $58,668 $31,800 Not Implemented
MI0320 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $58,406 $120 Implemented
MI0320 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,871 $1,660 Implemented
MI0320 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $40,560 $27,600 Implemented
MI0320 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $23,860 $3,600 Implemented
MI0320 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $18,035 $23,565 Implemented
MI0320 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,588 $2,300 Not Implemented
MI0320 # 08 Y:2017 08 2017 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,716 $6,530 Not Implemented
MI0320 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,100 $2,272 Not Implemented
MI0320 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $425 $134 Not Implemented
BS0104 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,510 $60,400 Not Implemented
BS0104 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,306 $482 Not Implemented
BS0104 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,223 $948 Not Implemented
BS0104 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $5,010 $7,576 Not Implemented
BS0104 # 06 Y:2017 06 2017 ELIMINATE/REDUCE AN OPERATION $72 $169 Not Implemented
BS0104 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $444 $990 Not Implemented