IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0463 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,314 $8,600 Not Implemented
SU0463 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,345 $14,020 Not Implemented
SF0527 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,577 $0 Implemented
SF0527 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $70 Implemented
SF0527 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,584 $27,496 Implemented
SF0527 # 04 Y:2018 04 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $76,906 $341,292 Not Implemented
UA0199 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,877 $13,552 Implemented
UA0199 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,483 $9,013 Implemented
UA0199 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $3,453 $1,385 Not Implemented
UA0199 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,814 $5,948 Not Implemented
UA0199 # 05 Y:2018 05 2018 OPTIMIZE PLANT POWER FACTOR $1,129 $2,568 Not Implemented
UA0199 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $182 $698 Implemented
UA0199 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $1,396 $453 Not Implemented
UA0199 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $919 Implemented
UA0199 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $253 $200 Not Implemented
MZ0257 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $2,925 Not Implemented
MZ0257 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $5,414 Not Implemented
MZ0257 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,472 $3,025 Not Implemented
MZ0257 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,800 Implemented
MZ0257 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,826 $0 Implemented
MZ0257 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $600 $752 Implemented
MZ0257 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $7,678 $7,480 Implemented
MZ0257 # 08 Y:2018 08 2018 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $839 $1,900 Implemented
MZ0257 # 09 Y:2018 09 2018 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,294 $5,330 Implemented
MZ0257 # 10 Y:2018 10 2018 USE COMPRESSOR AIR FILTERS $222 $200 Implemented