Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0244 # 02 Y:1988 | 02 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,077 | $935 | Implemented |
UD0244 # 03 Y:1988 | 03 | 1988 | INSTALL STORM WINDOWS AND DOORS | $8,290 | $3,000 | Implemented |
UD0244 # 04 Y:1988 | 04 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,365 | $5,000 | Not Implemented |
UD0237 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,394 | $200 | Implemented |
UD0237 # 02 Y:1987 | 02 | 1987 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,466 | $3,000 | Implemented |
UD0237 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,505 | $1,790 | Implemented |
UD0237 # 04 Y:1987 | 04 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $697 | $2,000 | Implemented |
UD0237 # 05 Y:1987 | 05 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,129 | $0 | Implemented |
UD0237 # 06 Y:1987 | 06 | 1987 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,305 | $67 | Implemented |
UD0237 # 07 Y:1987 | 07 | 1987 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,948 | $4,140 | Implemented |
UD0237 # 08 Y:1987 | 08 | 1987 | MINIMIZE WATER USAGE | $3,986 | $2,000 | Implemented |
UD0237 # 09 Y:1987 | 09 | 1987 | RECOVER AND REUSE COOLING WATER | $2,400 | $4,000 | Implemented |
UD0238 # 01 Y:1987 | 01 | 1987 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $20,472 | $36,000 | Implemented |
UD0238 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,814 | $0 | Implemented |
UD0238 # 03 Y:1987 | 03 | 1987 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,600 | $250 | Implemented |
UD0238 # 04 Y:1987 | 04 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,229 | $40 | Implemented |
UD0239 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,627 | $2,500 | Implemented |
UD0239 # 02 Y:1987 | 02 | 1987 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $23,356 | $10,000 | Implemented |
UD0239 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,341 | $600 | Implemented |
UD0239 # 04 Y:1987 | 04 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,069 | $6,000 | Implemented |
UD0241 # 01 Y:1988 | 01 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,400 | $600 | Implemented |
UD0241 # 02 Y:1988 | 02 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,575 | $2,000 | Not Implemented |
UD0241 # 03 Y:1988 | 03 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,254 | $15,000 | Not Implemented |
UD0241 # 04 Y:1988 | 04 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $32,901 | $22,000 | Not Implemented |
UD0241 # 05 Y:1988 | 05 | 1988 | OPERATE BOILERS ON HIGH FIRE SETTING | $7,000 | $5,000 | Not Implemented |