IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0233 # 01 Y:1987 01 1987 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,942 $3,000 Implemented
UD0233 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,036 $0 Implemented
UD0233 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $450 $0 Implemented
UD0227 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,035 $30,000 Implemented
UD0227 # 02 Y:1987 02 1987 OPTIMIZE PLANT POWER FACTOR $4,712 $12,000 Implemented
UD0227 # 03 Y:1987 03 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,245 $0 Not Implemented
UD0227 # 04 Y:1987 04 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $534 $6,000 Implemented
UD0227 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,752 $0 Not Implemented
UD0228 # 01 Y:1987 01 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,352 $13,000 Implemented
UD0228 # 02 Y:1987 02 1987 REDESIGN PROCESS $734 $200 Not Implemented
UD0228 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $50 Implemented
UD0229 # 01 Y:1987 01 1987 REDESIGN PROCESS $3,516 $0 Implemented
UD0229 # 02 Y:1987 02 1987 INCREASE AMOUNT OF CONDENSATE RETURNED $7,735 $2,000 Implemented
UD0229 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,624 $6,000 Implemented
UD0229 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,125 $935 Implemented
UD0229 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,776 $20,400 Implemented
UD0223 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,084 $0 Implemented
UD0223 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,302 $131 Implemented
UD0223 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $809 $100 Implemented
UD0224 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,584 $0 Not Implemented
UD0224 # 02 Y:1987 02 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,048 $7,200 Not Implemented
UD0224 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,509 $6,000 Not Implemented
UD0224 # 04 Y:1987 04 1987 REDUCE GLAZED AREAS IN BUILDINGS $3,429 $5,800 Not Implemented
UD0224 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,313 $2,500 Implemented
UD0225 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $2,781 $2,200 Implemented