Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0233 # 01 Y:1987 | 01 | 1987 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,942 | $3,000 | Implemented |
UD0233 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,036 | $0 | Implemented |
UD0233 # 03 Y:1987 | 03 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $450 | $0 | Implemented |
UD0227 # 01 Y:1987 | 01 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,035 | $30,000 | Implemented |
UD0227 # 02 Y:1987 | 02 | 1987 | OPTIMIZE PLANT POWER FACTOR | $4,712 | $12,000 | Implemented |
UD0227 # 03 Y:1987 | 03 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,245 | $0 | Not Implemented |
UD0227 # 04 Y:1987 | 04 | 1987 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $534 | $6,000 | Implemented |
UD0227 # 05 Y:1987 | 05 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,752 | $0 | Not Implemented |
UD0228 # 01 Y:1987 | 01 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,352 | $13,000 | Implemented |
UD0228 # 02 Y:1987 | 02 | 1987 | REDESIGN PROCESS | $734 | $200 | Not Implemented |
UD0228 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $410 | $50 | Implemented |
UD0229 # 01 Y:1987 | 01 | 1987 | REDESIGN PROCESS | $3,516 | $0 | Implemented |
UD0229 # 02 Y:1987 | 02 | 1987 | INCREASE AMOUNT OF CONDENSATE RETURNED | $7,735 | $2,000 | Implemented |
UD0229 # 03 Y:1987 | 03 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,624 | $6,000 | Implemented |
UD0229 # 04 Y:1987 | 04 | 1987 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,125 | $935 | Implemented |
UD0229 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,776 | $20,400 | Implemented |
UD0223 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,084 | $0 | Implemented |
UD0223 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,302 | $131 | Implemented |
UD0223 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $809 | $100 | Implemented |
UD0224 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,584 | $0 | Not Implemented |
UD0224 # 02 Y:1987 | 02 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,048 | $7,200 | Not Implemented |
UD0224 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,509 | $6,000 | Not Implemented |
UD0224 # 04 Y:1987 | 04 | 1987 | REDUCE GLAZED AREAS IN BUILDINGS | $3,429 | $5,800 | Not Implemented |
UD0224 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,313 | $2,500 | Implemented |
UD0225 # 01 Y:1987 | 01 | 1987 | OPTIMIZE PLANT POWER FACTOR | $2,781 | $2,200 | Implemented |