Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0784 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $858 $990 Implemented
OK0767 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,145 $1,383 Implemented
OK0767 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,151 $34,635 Not Implemented
OK0767 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $803 $3,455 Not Implemented
OK0767 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,640 $7,796 Not Implemented
OK0767 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,068 $200 Implemented
OK0767 # 06 Y:2008 06 2008 USE RADIANT HEATER FOR SPOT HEATING $81,407 $117,000 Not Implemented
OK0767 # 07 Y:2008 07 2008 INSTALL TIMERS AND/OR THERMOSTATS $46,431 $6,300 Implemented
OK0767 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,751 $0 Implemented
OK0759 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,284 $11,736 Implemented
OK0759 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $967 Implemented
OK0759 # 03 Y:2008 03 2008 OPERATE BOILERS ON HIGH FIRE SETTING $18,069 $17,500 Not Implemented
OK0759 # 04 Y:2008 04 2008 KEEP BOILER TUBES CLEAN $158,338 $6,876 Not Implemented
OK0759 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,208 $5,500 Not Implemented
OK0759 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,331 $1,619 Not Implemented
OK0753 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $49,649 $0 Implemented
OK0753 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,594 $289 Not Implemented
OK0753 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,786 $3,600 Not Implemented
OK0753 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $4,874 $9,950 Not Implemented
OK0753 # 05 Y:2007 05 2007 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $387,006 $553,000 Not Implemented
OK0753 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,715 $4,795 Not Implemented
OK0753 # 07 Y:2007 07 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,437 $13,500 Not Implemented
OK0753 # 08 Y:2007 08 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $0 Not Implemented
OK0753 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $4,489 Not Implemented
OK0751 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,572 $2,401 Not Implemented