IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0407 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $4,274 $600 n/a
WI0407 # 06 Y:2001 06 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $751 $0 n/a
WI0407 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $640 n/a
WI0407 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $0 n/a
MI0025 # 01 Y:2001 01 2001 RECOVER MECHANICAL ENERGY $165,750 $15,000 Not Implemented
MI0025 # 02 Y:2001 02 2001 ELIMINATE A BY-PRODUCT $35,000 $100 Not Implemented
MI0025 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $492 $2 Not Implemented
MI0025 # 04 Y:2001 04 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,050 $100 Implemented
MI0025 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $1,778 Implemented
LL0118 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $53,505 $55,889 Not Implemented
LL0118 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $10,056 $297 Implemented
LL0118 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,379 $2,190 Implemented
LL0118 # 04 Y:2001 04 2001 USE POWER DURING OFF-PEAK PERIODS $18,618 $0 Not Implemented
LL0118 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $36,180 $0 Implemented
LL0118 # 06 Y:2001 06 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,884 $456 Implemented
SU0119 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $0 Not Implemented
SU0119 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $930 $0 Implemented
SU0119 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,956 $4,900 Implemented
SU0119 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,095 $727 Implemented
SU0119 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $30,661 $208,950 Not Implemented
SU0119 # 06 Y:2001 06 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $46,417 $15,500 Not Implemented
SU0119 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,456 $0 Implemented
IA0277 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,148 $36,193 Not Implemented
IA0277 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $0 Implemented
IA0277 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $2,257 $3,259 Not Implemented