IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0585 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $11,758 $1,342 Implemented
UF0585 # 03 Y:2022 03 2022 INSTALL TURBULATORS $6,811 $7,500 Implemented
UF0585 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,918 $756 Implemented
UF0585 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $0 Implemented
UF0585 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $45,977 $0 Implemented
UF0585 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $19,210 $10,000 Implemented
UF0585 # 08 Y:2022 08 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,436 $448 Not Implemented
UC2202 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,740 $114,471 Implemented
UC2202 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,684 $2,000 Implemented
UC2202 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $960 Not Implemented
UC2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,344 $200 Implemented
UC2202 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,088 $543,322 Not Implemented
DL0211 # 01 Y:2022 01 2022 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $4,080 $450 Implemented
DL0211 # 02 Y:2022 02 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $233 Not Implemented
DL0211 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $17,800 $600 Not Implemented
DL0211 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,500 $120,300 Not Implemented
DL0211 # 05 Y:2022 05 2022 RECOVER WASTE HEAT FROM EQUIPMENT $14,276 $31,550 Implemented
DL0211 # 06 Y:2022 06 2022 RECOVER AND REUSE COOLING WATER $52,650 $50,000 Implemented
DL0211 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,560 $28,388 Not Implemented
DL0211 # 08 Y:2022 08 2022 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $3,578 $13,772 Implemented
DL0211 # 09 Y:2022 09 2022 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $28,000 $61,800 Not Implemented
DL0211 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,764 $2,451 Not Implemented
DL0211 # 11 Y:2022 11 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,347 $16,607 Implemented
AM0857 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $204,900 $15,000 n/a
AM0857 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $16,640 $31,840 n/a