Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0302 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,886 | $0 | Not Implemented |
TT0302 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,990 | $20,000 | Not Implemented |
TT0302 # 08 Y:2023 | 08 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,956 | $965 | Not Implemented |
UW2313 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $513,763 | $28,215 | Implemented |
UW2313 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,760 | $2,080 | Implemented |
UW2313 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $2,813 | $10,637 | Implemented |
NT0018 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,361 | $4,553 | Not Implemented |
NT0018 # 02 Y:2023 | 02 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $35,653 | $1,258 | Not Implemented |
NT0018 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,450 | $1,311 | Not Implemented |
NT0018 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,420 | $11,457 | Implemented |
NT0018 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,528 | $0 | Not Implemented |
NT0018 # 06 Y:2023 | 06 | 2023 | OPTIMIZE PLANT POWER FACTOR | $8,460 | $6,082 | Not Implemented |
NT0018 # 07 Y:2023 | 07 | 2023 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $45,600 | $27,500 | Not Implemented |
NT0018 # 08 Y:2023 | 08 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,056 | $0 | Not Implemented |
NT0018 # 09 Y:2023 | 09 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,092 | $5,443 | Not Implemented |
OR0779 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $3,315 | $0 | Not Implemented |
OR0779 # 02 Y:2023 | 02 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,749 | $0 | Not Implemented |
OR0779 # 03 Y:2023 | 03 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $43,575 | $54,837 | Not Implemented |
OR0779 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,725 | $57,101 | Not Implemented |
ORC010 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,713 | $12,000 | Not Implemented |
ORC010 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $1,211 | $2,500 | Not Implemented |
ORC010 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $3,391 | $30,000 | Not Implemented |
ORC010 # 04 Y:2023 | 04 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $8,755 | $1,000 | Not Implemented |
ORC010 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,690 | $0 | Implemented |
SJ0008 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,195 | $77,365 | Not Implemented |