IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1712 # 12 Y:2017 12 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $905 $1,053 Not Implemented
UK1712 # 13 Y:2017 13 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,790 $3,458 Not Implemented
OR0693 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,809 $500 Not Implemented
OR0693 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,614 $2,800 Not Implemented
OR0693 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,216 $28,216 Not Implemented
OR0693 # 04 Y:2017 04 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,260 $144,180 Not Implemented
TT0199 # 01 Y:2017 01 2017 CLEAN FOULING FROM WATER LINES REGULARLY $91,197 $8,500 Not Implemented
TT0199 # 02 Y:2017 02 2017 REPAIR OR REPLACE STEAM TRAPS $14,682 $4,830 Not Implemented
TT0199 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $5,729 $8,000 Not Implemented
TT0199 # 04 Y:2017 04 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,003 $25 Not Implemented
TT0199 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,715 $11,600 Not Implemented
WM0113 # 01 Y:2017 01 2017 USE SYNTHETIC LUBRICANT $21,176 $32,727 Not Implemented
WM0113 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,921 $18,856 Implemented
WM0113 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,755 $3,309 Not Implemented
WM0113 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,437 $3,721 Not Implemented
WM0113 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,074 $0 Not Implemented
WM0113 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $684 $1,000 Not Implemented
WM0113 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $235 $800 Not Implemented
GT0907 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $369 $120 Not Implemented
GT0907 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,145 $9,268 Not Implemented
GT0907 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $15,841 $80,789 Not Implemented
GT0907 # 04 Y:2017 04 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $519 $3,858 Not Implemented
NC0605 # 01 Y:2017 01 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,044 $93,000 Not Implemented
NC0605 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,828 $10,328 Implemented
NC0605 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118 $50 Implemented