IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0163 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $16,003 $2,000 Implemented
UD0163 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $17,374 $7,500 Implemented
UD0164 # 01 Y:1985 01 1985 REDUCE FLUID FLOW RATES $513 $150 Implemented
UD0164 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $1,368 $1,226 Implemented
UD0164 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,756 $25,000 Implemented
UD0164 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $13,000 Not Implemented
UD0165 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $33,571 $100,000 Not Implemented
UD0165 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,520 $21,000 Not Implemented
UD0165 # 03 Y:1985 03 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,623 $250 Not Implemented
UD0165 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,135 $2,000 Implemented
UD0165 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,934 $4,600 Implemented
UD0165 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,435 $0 Implemented
UD0165 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,848 $1,500 Implemented
UD0157 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,237 $250 Implemented
UD0157 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,875 $1,994 Implemented
UD0158 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,260 Implemented
UD0158 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $434 $280 Implemented
UD0158 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,850 $18,000 Not Implemented
UD0158 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $240 Implemented
UD0160 # 01 Y:1985 01 1985 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $26,076 $20,000 Implemented
UD0160 # 02 Y:1985 02 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,657 $2,000 Implemented
UD0160 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,357 $1,400 Implemented
UD0160 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $200 Implemented
UD0160 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,689 $0 Implemented
UD0160 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,825 $551 Implemented