Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0163 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,003 | $2,000 | Implemented |
UD0163 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $17,374 | $7,500 | Implemented |
UD0164 # 01 Y:1985 | 01 | 1985 | REDUCE FLUID FLOW RATES | $513 | $150 | Implemented |
UD0164 # 02 Y:1985 | 02 | 1985 | INSTALL STORM WINDOWS AND DOORS | $1,368 | $1,226 | Implemented |
UD0164 # 03 Y:1985 | 03 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,756 | $25,000 | Implemented |
UD0164 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,000 | $13,000 | Not Implemented |
UD0165 # 01 Y:1985 | 01 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $33,571 | $100,000 | Not Implemented |
UD0165 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,520 | $21,000 | Not Implemented |
UD0165 # 03 Y:1985 | 03 | 1985 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,623 | $250 | Not Implemented |
UD0165 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,000 | Implemented |
UD0165 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,934 | $4,600 | Implemented |
UD0165 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,435 | $0 | Implemented |
UD0165 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,848 | $1,500 | Implemented |
UD0157 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,237 | $250 | Implemented |
UD0157 # 03 Y:1985 | 03 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,875 | $1,994 | Implemented |
UD0158 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $1,260 | Implemented |
UD0158 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $434 | $280 | Implemented |
UD0158 # 03 Y:1985 | 03 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,850 | $18,000 | Not Implemented |
UD0158 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $240 | Implemented |
UD0160 # 01 Y:1985 | 01 | 1985 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $26,076 | $20,000 | Implemented |
UD0160 # 02 Y:1985 | 02 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,657 | $2,000 | Implemented |
UD0160 # 03 Y:1985 | 03 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,357 | $1,400 | Implemented |
UD0160 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $280 | $200 | Implemented |
UD0160 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,689 | $0 | Implemented |
UD0160 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,825 | $551 | Implemented |