IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0018 # 05 Y:1988 05 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $773 $280 Not Implemented
AM0018 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN WATER LINES AND VALVES $162 $70 Implemented
AM0019 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,753 $12,132 Implemented
AM0019 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,617 $520 Implemented
AM0019 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $700 Implemented
AM0019 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $267 $0 Not Implemented
AM0020 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $2,009 $3,919 Not Implemented
AM0020 # 02 Y:1988 02 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,198 $2,000 Implemented
AM0020 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $939 $520 Implemented
AM0020 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $360 $0 Implemented
AM0020 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $230 $0 Implemented
AM0021 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $7,062 $5,600 Implemented
AM0021 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,192 $7,675 Not Implemented
AM0021 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,294 $1,450 Implemented
AM0021 # 04 Y:1988 04 1988 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,556 $300 Implemented
AM0021 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $1,619 $0 Not Implemented
AM0021 # 06 Y:1988 06 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $652 $500 Implemented
AM0021 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57 $47 Not Implemented
LT0112 # 01 Y:1988 01 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,530 $4,640 Not Implemented
LT0112 # 02 Y:1988 02 1988 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,340 $0 Not Implemented
LT0112 # 03 Y:1988 03 1988 OPTIMIZE PLANT POWER FACTOR $2,060 $4,940 Not Implemented
LT0112 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $655 $0 Not Implemented
LT0088 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $15,432 $22,500 Implemented
LT0088 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $754 $377 Implemented
LT0088 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $1,910 $860 Not Implemented