Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,599
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0891 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,852 | $88,000 | Implemented |
GT0891 # 08 Y:2012 | 08 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,990 | $12,300 | Not Implemented |
GT0891 # 09 Y:2012 | 09 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,190 | $12,795 | Not Implemented |
GT0891 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,720 | $20,395 | Not Implemented |
GT0890 # 01 Y:2012 | 01 | 2012 | ADD AREA LIGHTING SWITCHES | $1,457 | $3,630 | Not Implemented |
GT0890 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,722 | $19,250 | Not Implemented |
GT0890 # 03 Y:2012 | 03 | 2012 | REDUCE VENTILATION AIR | $36,009 | $9,600 | Not Implemented |
GT0890 # 04 Y:2012 | 04 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,969 | $0 | Not Implemented |
GT0890 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,607 | $6,000 | Not Implemented |
GT0888 # 01 Y:2012 | 01 | 2012 | USE SYNTHETIC LUBRICANT | $32,596 | $0 | Not Implemented |
GT0888 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $100 | $0 | Not Implemented |
GT0888 # 03 Y:2012 | 03 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,563 | $2,250 | Not Implemented |
GT0888 # 04 Y:2012 | 04 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,915 | $1,680 | Not Implemented |
GT0888 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,200 | $15,000 | Not Implemented |
GT0888 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $12,520 | $18,060 | Not Implemented |
GT0888 # 07 Y:2012 | 07 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,690 | $109,600 | Not Implemented |
GT0888 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,305 | $18,600 | Not Implemented |
GT0886 # 01 Y:2011 | 01 | 2011 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $30,160 | $2,400 | Not Implemented |
GT0886 # 02 Y:2011 | 02 | 2011 | METER WASTE WATER | $5,529 | $2,500 | Implemented |
GT0886 # 03 Y:2011 | 03 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $3,617 | $9,994 | Implemented |
GT0886 # 04 Y:2011 | 04 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $51,129 | $25,000 | Implemented |
GT0886 # 05 Y:2011 | 05 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $24,782 | $14,000 | Implemented |
GT0885 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,060 | $2,500 | Implemented |
GT0885 # 02 Y:2011 | 02 | 2011 | DISCONNECT BALLASTS | $635 | $885 | Not Implemented |
GT0885 # 03 Y:2011 | 03 | 2011 | USE PHOTOCELL CONTROLS | $197 | $285 | Implemented |