Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0463 # 03 Y:2015 | 03 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,674 | $4,000 | Not Implemented |
UM0463 # 04 Y:2015 | 04 | 2015 | CONVERT TO OXYFUEL BURNERS | $3,052,580 | $1,000,000 | Not Implemented |
UM0462 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,802 | $7,405 | Not Implemented |
UM0462 # 02 Y:2015 | 02 | 2015 | HEAT WATER WITH EXHAUST HEAT | $16,361 | $20,000 | Not Implemented |
UM0462 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,500 | $8,000 | Not Implemented |
UM0462 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,638 | $4,500 | Not Implemented |
UM0462 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,224 | $1,000 | Not Implemented |
UM0462 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $2,455 | $4,800 | Not Implemented |
UM0461 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $940 | $800 | Not Implemented |
UM0461 # 02 Y:2015 | 02 | 2015 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,840 | $475 | Not Implemented |
UM0461 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $2,000 | Implemented |
UM0461 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,928 | $1,000 | Implemented |
UM0461 # 05 Y:2015 | 05 | 2015 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $479 | $200 | Not Implemented |
UM0461 # 06 Y:2015 | 06 | 2015 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $195 | $1,000 | Not Implemented |
UM0461 # 07 Y:2015 | 07 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,782 | $3,000 | Not Implemented |
UM0460 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,160 | $1,100 | Implemented |
UM0460 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,482 | $3,500 | Not Implemented |
UM0460 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,526 | $161,000 | Implemented |
UM0460 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $305 | $1,000 | Not Implemented |
UM0460 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,072 | $4,000 | Implemented |
UM0458 # 01 Y:2015 | 01 | 2015 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $7,036 | $0 | Implemented |
UM0456 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,025 | $1,500 | Implemented |
UM0456 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $21,808 | $17,500 | Implemented |
UM0456 # 03 Y:2015 | 03 | 2015 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,298 | $100 | Not Implemented |
UM0456 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,704 | $10,000 | Implemented |