IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0434 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,121 $16,500 Implemented
UM0434 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $3,479 $4,000 Not Implemented
UM0434 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,445 $8,750 Not Implemented
UM0434 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $2,500 Implemented
UM0434 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,027 $200 Not Implemented
UD0891 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $112,427 $100,000 Not Implemented
UD0891 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,664 $3,000 Implemented
UD0891 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $8,643 $30,000 Not Implemented
UD0891 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $868 $1,000 Implemented
UD0891 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,992 $27,380 Not Implemented
UD0891 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $300 Not Implemented
UM0433 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,008 $21,730 Not Implemented
UM0433 # 02 Y:2013 02 2013 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $19,439 $2,500 Implemented
UM0433 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,580 $1,000 Not Implemented
UM0433 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $37,193 $1,000 Implemented
UM0432 # 01 Y:2013 01 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,000 $10,000 Implemented
UM0432 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $8,484 $15,000 Not Implemented
UM0432 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,532 $200 Implemented
UM0432 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $2,500 Implemented
UM0431 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $25,011 $30,000 Implemented
UM0431 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,730 $38,000 Not Implemented
UM0431 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $200 Not Implemented
UM0431 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,832 $2,500 Not Implemented
UM0430 # 01 Y:2013 01 2013 RECOVER MECHANICAL ENERGY $45,000 $8,000 Not Implemented
UM0430 # 02 Y:2013 02 2013 RECOVER MECHANICAL ENERGY $18,100 $15,500 Not Implemented