Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0566 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $4,340 | $9,990 | Implemented |
OR0566 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,690 | $1,690 | Implemented |
OR0566 # 04 Y:2011 | 04 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,620 | $37,500 | Not Implemented |
OR0566 # 05 Y:2011 | 05 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,200 | $146,000 | Not Implemented |
OR0565 # 01 Y:2011 | 01 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,900 | $9,340 | Implemented |
OR0565 # 02 Y:2011 | 02 | 2011 | INSULATE BARE EQUIPMENT | $6,110 | $21,715 | Implemented |
OR0565 # 03 Y:2011 | 03 | 2011 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,300 | $17,700 | Implemented |
OR0565 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,820 | $19,210 | Not Implemented |
OR0565 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,900 | $10,900 | Implemented |
OR0565 # 06 Y:2011 | 06 | 2011 | HEAT WATER WITH EXHAUST HEAT | $77,370 | $96,750 | Implemented |
OR0565 # 07 Y:2011 | 07 | 2011 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $434 | $1,877 | Not Implemented |
OR0564 # 01 Y:2010 | 01 | 2010 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $11,375 | $32,340 | Not Implemented |
OR0564 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,314 | $31,314 | Implemented |
OR0564 # 03 Y:2010 | 03 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $9,666 | $40,000 | Not Implemented |
OR0564 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,849 | $7,575 | Not Implemented |
OR0564 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM THICKNESS INSULATION | $64,658 | $105,222 | Implemented |
OR0564 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $7,248 | $31,290 | Not Implemented |
OR0563 # 01 Y:2010 | 01 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $35,913 | $17,860 | Not Implemented |
OR0563 # 02 Y:2010 | 02 | 2010 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $219,003 | $250,000 | Implemented |
OR0563 # 03 Y:2010 | 03 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,600 | $244,000 | Implemented |
OR0563 # 04 Y:2010 | 04 | 2010 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,100,000 | $2,150,000 | Not Implemented |
OR0562 # 01 Y:2010 | 01 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,447 | $2,500 | Implemented |
OR0562 # 02 Y:2010 | 02 | 2010 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,592 | $14,997 | Not Implemented |
OR0562 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,447 | $2,724 | Implemented |
OR0562 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,192 | $0 | Implemented |