IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0447 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $4,925 Implemented
MA0447 # 03 Y:1999 03 1999 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,511 $2,500 Not Implemented
MA0447 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,321 $45,420 Not Implemented
MA0447 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $591 $120 Implemented
MA0447 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $504 $455 Not Implemented
MA0447 # 07 Y:1999 07 1999 INSTALL TIMERS AND/OR THERMOSTATS $473 $748 Implemented
MA0447 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $5,925 Not Implemented
AR0172 # 01 Y:1999 01 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $158 $238 Not Implemented
AR0172 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $74 $120 Not Implemented
AR0172 # 03 Y:1999 03 1999 MINIMIZE WATER USAGE $352 $900 Not Implemented
AR0172 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,802 $8,767 Not Implemented
AR0172 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $9,600 $1,000 Not Implemented
NC0175 # 01 Y:1999 01 1999 IMPROVE SPACE COMFORT CONDITIONING $2,400 $1,000 n/a
NC0175 # 02 Y:1999 02 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $52,800 $1,000 n/a
MO0266 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,430 $3,948 Not Implemented
MO0266 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,291 $97 Implemented
MO0266 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,662 $80 Not Implemented
MO0266 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,816 $2,451 Implemented
MO0266 # 05 Y:1999 05 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,475 $0 Implemented
MO0266 # 06 Y:1999 06 1999 BURN WASTE OIL FOR HEAT $4,200 $2,000 Not Implemented
MO0266 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,236 $2,500 Not Implemented
NC0175 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,698 $3,000 n/a
NC0175 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,887 $8,000 n/a
NC0175 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,727 $5,500 n/a
NC0175 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,424 $500 n/a