Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0066 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,849 | $14,148 | n/a |
IC0066 # 09 Y:2003 | 09 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,071 | $78,893 | n/a |
UD0682 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,674 | $15,870 | Not Implemented |
UD0682 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,255 | $5,000 | Not Implemented |
UD0682 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $11,000 | Not Implemented |
UD0682 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,809 | $47,488 | Not Implemented |
UD0682 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,790 | $3,000 | Implemented |
UD0682 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,062 | $5,376 | Not Implemented |
UD0682 # 07 Y:2003 | 07 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,800 | $2,000 | Implemented |
UD0682 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $1,000 | Implemented |
UD0682 # 09 Y:2003 | 09 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $2,596 | $0 | Implemented |
UD0682 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $1,534 | $116 | Not Implemented |
UD0682 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $366 | $428 | Not Implemented |
SF0269 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,192 | $0 | Not Implemented |
SF0269 # 02 Y:2003 | 02 | 2003 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $635 | $0 | Implemented |
SF0269 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,974 | $0 | Not Implemented |
SF0269 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $5,516 | $3,984 | Not Implemented |
SF0269 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,653 | $0 | Implemented |
SF0269 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,739 | $3,905 | Not Implemented |
SF0269 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $633 | $1,743 | Not Implemented |
OR0438 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,850 | $24,500 | Implemented |
OR0438 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,950 | $0 | Implemented |
OR0438 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,000 | $3,000 | Implemented |
OR0438 # 04 Y:2003 | 04 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,260 | $290 | Not Implemented |
OR0438 # 05 Y:2003 | 05 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,500 | $150 | Implemented |