Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0113 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,800 | $7,588 | Implemented |
DL0113 # 05 Y:2013 | 05 | 2013 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $25,100 | $9,800 | Not Implemented |
DL0113 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $8,270 | $7,000 | Not Implemented |
DL0113 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,030 | $18,354 | Implemented |
IA0510 # 01 Y:2013 | 01 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $58,322 | $6,395 | Not Implemented |
IA0510 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $7,547 | $2,769 | Not Implemented |
IA0510 # 03 Y:2013 | 03 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,742 | $30,000 | Not Implemented |
IA0510 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,760 | $600 | Not Implemented |
IA0510 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,723 | $30 | Not Implemented |
IA0510 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,748 | $7,018 | Not Implemented |
IA0510 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,538 | $30,502 | Not Implemented |
IA0510 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,980 | $1,290 | Not Implemented |
UA3030 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $115,835 | $27,390 | Not Implemented |
UA3030 # 02 Y:2013 | 02 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $76,352 | $32,825 | Not Implemented |
UA3030 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $71,086 | $800 | Implemented |
OR0618 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,881 | $3,300 | Not Implemented |
OR0618 # 02 Y:2013 | 02 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $10,380 | $800 | Not Implemented |
OR0618 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $977 | $1,975 | Not Implemented |
OR0618 # 04 Y:2013 | 04 | 2013 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $9,796 | $50,179 | Not Implemented |
OR0618 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,187 | $2,283 | Not Implemented |
TT0105 # 01 Y:2013 | 01 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,590 | $1,500 | Implemented |
TT0105 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,000 | $50,000 | Not Implemented |
TT0105 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,416 | $10,000 | Not Implemented |
TT0105 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,521 | $31,163 | Not Implemented |
TT0105 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $566 | $1,364 | Not Implemented |