IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0443 # 02 Y:2017 02 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $716 $675 Not Implemented
AS0443 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $27,764 $4,325 Implemented
AS0443 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,821 $140 Implemented
LS0005 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $69,401 $106,209 Not Implemented
LS0005 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,903 $21,300 Implemented
LS0005 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,795 $4,000 Implemented
LS0005 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,832 $100 Implemented
LS0005 # 05 Y:2017 05 2017 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $134,326 $621,739 Not Implemented
LS0005 # 06 Y:2017 06 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,044 $34,056 Not Implemented
LS0005 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,997 $3,280 Implemented
LS0005 # 08 Y:2017 08 2017 INSTALL TIMERS AND/OR THERMOSTATS $330 $400 Implemented
LS0005 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $347 $585 Implemented
MI0319 # 01 Y:2017 01 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $288,813 $48,000 Implemented
MI0319 # 02 Y:2017 02 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $172,588 $249,599 Not Implemented
MI0319 # 03 Y:2017 03 2017 UPGRADE OBSOLETE EQUIPMENT $120,000 $42,000 Not Implemented
MI0319 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $84,550 $59,400 Implemented
MI0319 # 05 Y:2017 05 2017 PAY UTILITY BILLS ON TIME $29,840 $0 Implemented
MI0319 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,311 $12,000 Not Implemented
MI0319 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,257 $1,670 Implemented
NL0011 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,874 $0 Not Implemented
NL0011 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,747 $20,139 Implemented
NL0011 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $1,571 Not Implemented
NL0011 # 04 Y:2017 04 2017 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $982 $0 Implemented
SU0449 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,375 $267 Not Implemented
SU0449 # 02 Y:2017 02 2017 ELIMINATE/REDUCE AN OPERATION $1,271 $900 Not Implemented