Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0443 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $716 | $675 | Not Implemented |
AS0443 # 03 Y:2017 | 03 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $27,764 | $4,325 | Implemented |
AS0443 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,821 | $140 | Implemented |
LS0005 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $69,401 | $106,209 | Not Implemented |
LS0005 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,903 | $21,300 | Implemented |
LS0005 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,795 | $4,000 | Implemented |
LS0005 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,832 | $100 | Implemented |
LS0005 # 05 Y:2017 | 05 | 2017 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $134,326 | $621,739 | Not Implemented |
LS0005 # 06 Y:2017 | 06 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,044 | $34,056 | Not Implemented |
LS0005 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,997 | $3,280 | Implemented |
LS0005 # 08 Y:2017 | 08 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $330 | $400 | Implemented |
LS0005 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $347 | $585 | Implemented |
MI0319 # 01 Y:2017 | 01 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $288,813 | $48,000 | Implemented |
MI0319 # 02 Y:2017 | 02 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $172,588 | $249,599 | Not Implemented |
MI0319 # 03 Y:2017 | 03 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $120,000 | $42,000 | Not Implemented |
MI0319 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $84,550 | $59,400 | Implemented |
MI0319 # 05 Y:2017 | 05 | 2017 | PAY UTILITY BILLS ON TIME | $29,840 | $0 | Implemented |
MI0319 # 06 Y:2017 | 06 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $26,311 | $12,000 | Not Implemented |
MI0319 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,257 | $1,670 | Implemented |
NL0011 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,874 | $0 | Not Implemented |
NL0011 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,747 | $20,139 | Implemented |
NL0011 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,135 | $1,571 | Not Implemented |
NL0011 # 04 Y:2017 | 04 | 2017 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $982 | $0 | Implemented |
SU0449 # 01 Y:2017 | 01 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,375 | $267 | Not Implemented |
SU0449 # 02 Y:2017 | 02 | 2017 | ELIMINATE/REDUCE AN OPERATION | $1,271 | $900 | Not Implemented |