IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0614 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $582 $100 Not Implemented
NC0614 # 06 Y:2018 06 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,876 $2,450 Not Implemented
NC0614 # 07 Y:2018 07 2018 RECOVER AND REUSE COOLING WATER $2,197 $3,000 Not Implemented
NC0615 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,150 $25,474 Implemented
NC0615 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $250 $250 Not Implemented
NC0615 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,044 $165 Implemented
NC0615 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $197 $900 Not Implemented
NC0615 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $50 Not Implemented
NC0615 # 06 Y:2018 06 2018 UPGRADE CONTROLS ON COMPRESSORS $1,380 $4,000 Not Implemented
NC0615 # 07 Y:2018 07 2018 AVOID REWINDING MOTORS MORE THAN TWICE $5,240 $12,129 Implemented
NC0615 # 08 Y:2018 08 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,491 $3,500 Not Implemented
NC0615 # 09 Y:2018 09 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,615 $500 Not Implemented
NC0615 # 10 Y:2018 10 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $282 $50 Implemented
MA0793 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,323 $28,940 Not Implemented
MA0793 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $5,974 Implemented
MA0793 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,289 $5,525 Not Implemented
MA0793 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $1,522 $1,000 Not Implemented
MA0793 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,012 $500 Implemented
MA0793 # 06 Y:2018 06 2018 REDUCE VENTILATION AIR $419 $1,000 Not Implemented
UU0137 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $48,448 $23,000 Not Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented
UU0137 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $26,521 $17,000 Implemented
UU0137 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,622 $7,600 Implemented
UU0137 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,310 $7,650 Implemented
UU0137 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $973 $3,500 Implemented