IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0205 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,527 $300 Not Implemented
LE0205 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
LE0196 # 01 Y:2004 01 2004 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $63,437 $239,000 Not Implemented
LE0196 # 02 Y:2004 02 2004 ADOPT IN-HOUSE MATERIAL GENERATION $27,869 $27,000 Not Implemented
LE0196 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,639 $5,000 Implemented
LE0196 # 04 Y:2004 04 2004 MINIMIZE WATER USAGE $16,092 $2,000 Not Implemented
LE0196 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,917 $57,000 Implemented
LE0196 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $10,457 $0 Implemented
LE0196 # 07 Y:2004 07 2004 UPGRADE OBSOLETE EQUIPMENT $9,536 $8,000 Not Implemented
LE0196 # 08 Y:2004 08 2004 OPTIMIZE PLANT POWER FACTOR $7,875 $11,050 Not Implemented
LE0196 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,088 $0 Implemented
LE0182 # 01 Y:2004 01 2004 USE OPTIMUM THICKNESS INSULATION $12,028 $752 Not Implemented
LE0182 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,612 $10,336 Not Implemented
LE0182 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $9,794 $9,794 Not Implemented
LE0182 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,437 $300 Implemented
LE0182 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $577 $0 Implemented
LE0182 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,756 $94,677 Not Implemented
LE0178 # 01 Y:2004 01 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,185 $6,000 Not Implemented
LE0178 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,795 $75,903 Not Implemented
LE0178 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,543 $750 Not Implemented
LE0178 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,515 $300 Not Implemented
LE0178 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,757 $720 Not Implemented
LE0178 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,940 $0 Not Implemented
LE0178 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,837 $2,500 Not Implemented
LE0178 # 08 Y:2004 08 2004 OPTIMIZE PLANT POWER FACTOR $1,521 $6,250 Not Implemented