Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0430 # 03 Y:2013 | 03 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $16,100 | $5,500 | Not Implemented |
UM0430 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,154 | $29,153 | Implemented |
UM0429 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,689 | $59,040 | Implemented |
UM0429 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,926 | $1,000 | Not Implemented |
UM0429 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,525 | $1,000 | Implemented |
UM0429 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,321 | $5,000 | Implemented |
UM0429 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,185 | $4,420 | Not Implemented |
UM0428 # 01 Y:2013 | 01 | 2013 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $74,405 | $210,000 | Not Implemented |
UM0428 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,106 | $1,500 | Implemented |
UM0428 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $990 | $100 | Implemented |
UM0428 # 04 Y:2013 | 04 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $636 | $1,200 | Implemented |
UM0428 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,177 | $9,000 | Implemented |
UM0428 # 06 Y:2013 | 06 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,332 | $500 | Not Implemented |
UM0427 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,442 | $10,650 | Not Implemented |
UM0427 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,680 | $9,000 | Implemented |
UM0427 # 03 Y:2013 | 03 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,140 | $5,000 | Not Implemented |
UM0427 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,906 | $6,500 | Implemented |
UM0427 # 05 Y:2013 | 05 | 2013 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $196,098 | $500,000 | Not Implemented |
UM0427 # 06 Y:2013 | 06 | 2013 | INSTALL EFFICIENT RECTIFIERS | $20,863 | $12,000 | Not Implemented |
UM0426 # 01 Y:2013 | 01 | 2013 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,129 | $17,000 | Implemented |
UM0426 # 02 Y:2013 | 02 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,400 | $12,000 | Not Implemented |
UM0426 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,910 | $3,500 | Not Implemented |
UM0426 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,407 | $1,500 | Implemented |
UM0426 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,226 | $1,000 | Implemented |
UM0425 # 01 Y:2013 | 01 | 2013 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,900 | $13,000 | Not Implemented |