IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0105 # 06 Y:2013 06 2013 COMBINE UTILITY METERS $25,405 $5,000 Not Implemented
TT0105 # 07 Y:2013 07 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,670 $500 Not Implemented
IA0509 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,219 $283,479 Implemented
IA0509 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $2,684 Implemented
IA0509 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,438 $549 Implemented
IA0509 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,088 $750 Implemented
IA0509 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $50 Implemented
IA0509 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,616 $30,838 Implemented
IA0509 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,690 $180 Implemented
IA0509 # 08 Y:2013 08 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $684 $870 Implemented
IA0509 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,925 $425 Implemented
SU0351 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,135 $0 Implemented
SU0351 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $785 $0 Not Implemented
SU0351 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $115 $0 Implemented
SU0351 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $109 $0 Not Implemented
SU0351 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $455 Implemented
SU0351 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $361 $399 Implemented
SU0351 # 07 Y:2013 07 2013 ELIMINATE/REDUCE AN OPERATION $1,856 $4,320 Not Implemented
SU0351 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35 $85 Not Implemented
SU0351 # 09 Y:2013 09 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $109 $374 Not Implemented
SU0351 # 10 Y:2013 10 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $972 Not Implemented
WM0029 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,132 $3,066 Not Implemented
WM0029 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,542 $1,240 Implemented
WM0029 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,494 $2,200 Not Implemented
WM0029 # 04 Y:2013 04 2013 USE SYNTHETIC LUBRICANT $23,138 $22,800 Not Implemented