IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1910 # 02 Y:2019 02 2019 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $510 $1,775 Implemented
UK1910 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $280 $161 Implemented
UK1910 # 04 Y:2019 04 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,283 $0 Implemented
UK1910 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,342 $110,141 Implemented
UK1910 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $569 $300 Implemented
UK1910 # 07 Y:2019 07 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $838 $350 Implemented
UK1910 # 08 Y:2019 08 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,365 $3,625 Implemented
UK1910 # 09 Y:2019 09 2019 REDUCE FLUID FLOW RATES $1,484 $1,900 Implemented
UK1910 # 10 Y:2019 10 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,344 $2,838 Implemented
UK1910 # 11 Y:2019 11 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,251 $1,000 Implemented
UK1910 # 12 Y:2019 12 2019 OPTIMIZE PLANT POWER FACTOR $13,040 $16,170 Implemented
UK1910 # 13 Y:2019 13 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,015 $0 Implemented
UU0155 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $102,278 $823,000 Implemented
UU0155 # 02 Y:2019 02 2019 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,015 $46,625 Not Implemented
UU0155 # 03 Y:2019 03 2019 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $898 $1,650 Implemented
AS0478 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,716 $2,242 Implemented
AS0478 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,212 $45,350 Not Implemented
AS0478 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $13,813 $447 Not Implemented
AS0478 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,543 $27,245 Not Implemented
AS0478 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $2,918 Implemented
GT0931 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,292 $3,500 Implemented
GT0931 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $2,451 $1,382 Implemented
GT0931 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,194 $25,005 Implemented
GT0931 # 04 Y:2019 04 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,893 $19,194 Not Implemented
GT0931 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,664 $4,500 Implemented