IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2403 # 06 Y:2024 06 2024 UPGRADE OBSOLETE EQUIPMENT $6,846 $30,000 n/a
UW2403 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,319 $720 n/a
UW2403 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,988 $1,080 n/a
UW2403 # 03 Y:2024 03 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $222,893 $500,000 n/a
UW2403 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,147 $4,257 n/a
UW2403 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $8,480 $4,010 n/a
UW2402 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,076 $311,400 n/a
UW2402 # 07 Y:2024 07 2024 USE SOLAR HEAT TO HEAT WATER $13,327 $84,652 n/a
UW2402 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $17,310 $375 n/a
UW2402 # 05 Y:2024 05 2024 USE OTHER WASTE CONCENTRATION METHODS $25,000 $104,000 n/a
UW2402 # 04 Y:2024 04 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $55,000 $117,000 n/a
UW2402 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $282 $1,742 n/a
UW2402 # 02 Y:2024 02 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,045 $582 n/a
UW2402 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,442 $5,083 n/a
UW2401 # 06 Y:2024 06 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $26,650 $58,013 n/a
UW2401 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,098 $26,080 n/a
UW2401 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $6,204 $23,347 n/a
UW2401 # 03 Y:2024 03 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,711 $4,441 n/a
UW2401 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,688 $3,000 n/a
UW2401 # 01 Y:2024 01 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $141,044 $149,500 n/a
UW2319 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,001 $2,820 Not Implemented
UW2319 # 01 Y:2023 01 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $56,470 $23,651 Not Implemented
UW2319 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,837 $2,080 Not Implemented
UW2319 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,443 $68,000 Not Implemented
UW2319 # 06 Y:2023 06 2023 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $750,000 $871,000 Not Implemented