Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0484 # 01 Y:2001 01 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,050 $8,660 n/a
CO0484 # 02 Y:2001 02 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,440 $1,670 n/a
CO0484 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $390 n/a
CO0484 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,010 $4,000 n/a
CO0484 # 05 Y:2001 05 2001 USE SOLAR HEAT TO HEAT MAKE-UP AIR $2,110 $12,600 n/a
CO0484 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $30 n/a
CO0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $0 n/a
CO0484 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $34,130 $7,350 n/a
CO0484 # 09 Y:2001 09 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $14,950 $0 n/a
CO0484 # 10 Y:2001 10 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $11,240 $20,000 n/a
CO0467 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,730 $2,000 Not Implemented
CO0467 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,280 $2,250 Not Implemented
CO0467 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $0 Implemented
CO0467 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $340 $370 Implemented
CO0467 # 05 Y:2000 05 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $1,040 Not Implemented
CO0467 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $310 $1,070 Not Implemented
CO0467 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $530 $0 Not Implemented
CO0447 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,160 $5,000 Implemented
CO0447 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $660 Implemented
CO0447 # 03 Y:1999 03 1999 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,250 $1,100 Not Implemented
CO0447 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $170 $0 Not Implemented
CO0447 # 05 Y:1999 05 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $80,060 $200,000 Implemented
CO0447 # 06 Y:1999 06 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,130 $30,000 Not Implemented
CO0410 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $598 Not Implemented
CO0410 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $480 Not Implemented