IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0268 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,836 $1,190 Not Implemented
UA0268 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,089 $17,628 Not Implemented
UA0268 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $668 $557 Not Implemented
UA0268 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,098 $8,397 Not Implemented
UA0268 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,641 $9,092 Not Implemented
UA0268 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,807 $1,000 Not Implemented
UW2220 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $94,066 $513,443 Not Implemented
UW2220 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,961 $1,423 Implemented
UW2220 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,653 $33,398 Implemented
UW2220 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,980 $800 Implemented
IP0168 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,243 $0 Implemented
IP0168 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,060 $8,140 Implemented
IP0168 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,815 $12,140 Implemented
IP0168 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,112 $22,920 Implemented
IP0168 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,513 $4,848 Implemented
IP0168 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,045 $4,576 Implemented
IP0168 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $939 $713 Implemented
IP0168 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,542 $5,311 Implemented
IP0168 # 09 Y:2022 09 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $254 $600 Implemented
IP0168 # 10 Y:2022 10 2022 USE PHOTOCELL CONTROLS $237 $727 Implemented
TR0036 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $105,888 $1,890,673 Not Implemented
TR0036 # 02 Y:2022 02 2022 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $3,510 $40,423 Not Implemented
TR0036 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $755 Implemented
TR0034 # 05 Y:2022 05 2022 REDUCE HEAT GAIN BY WINDOW TINTING $56 $846 Not Implemented
TR0034 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,468 $36,208 Implemented