IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0123 # 07 Y:2014 07 2014 MODIFY STARTUP/SHUTDOWN TIMES $15,087 $0 Not Implemented
UA0123 # 08 Y:2014 08 2014 PAY BILLS ON TIME TO AVOID LATE FEES $6,166 $0 Not Implemented
UA0122 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $26,427 $700 Not Implemented
UA0122 # 02 Y:2014 02 2014 MODIFY STARTUP/SHUTDOWN TIMES $13,749 $0 Not Implemented
UA0122 # 03 Y:2014 03 2014 COMBINE UTILITY METERS $87 $0 Not Implemented
UA0122 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,325 $12,089 Not Implemented
UA0122 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $7,195 Implemented
UA0122 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,196 $100 Implemented
UA0122 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,622 $654 Not Implemented
UA0121 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,355 $300 Not Implemented
UA0121 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,866 $9,095 Implemented
UA0121 # 03 Y:2014 03 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $27,986 $37,058 Not Implemented
UA0121 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $942 $1,018 Not Implemented
UA0121 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,373 $30,376 Not Implemented
UA0120 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,979 $24,613 Implemented
UA0120 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,756 $800 Not Implemented
UA0120 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,394 $5,695 Implemented
UA0120 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $4,402 $160 Not Implemented
UA0120 # 05 Y:2014 05 2014 MODIFY STARTUP/SHUTDOWN TIMES $3,313 $0 Not Implemented
UA0119 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,645 $52,587 Implemented
UA0119 # 02 Y:2014 02 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,604 $1,767 Not Implemented
UA0119 # 03 Y:2014 03 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $7,137 $8,685 Implemented
UA0119 # 04 Y:2014 04 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,015 $23,300 Not Implemented
UA0119 # 05 Y:2014 05 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,076 $1,000 Implemented
UA0119 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,506 $5,595 Implemented