Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,553
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0096 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,442 | $6,685 | Implemented |
HO0096 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $101 | $417 | Not Implemented |
HO0096 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,178 | $900 | Not Implemented |
HO0096 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,471 | $1,000 | Implemented |
HO0096 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $695 | $400 | Not Implemented |
HO0096 # 07 Y:1995 | 07 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $120 | $141 | Not Implemented |
MA0330 # 01 Y:1995 | 01 | 1995 | CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES | $216,508 | $0 | Not Implemented |
MA0330 # 02 Y:1995 | 02 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,739 | $37,200 | Not Implemented |
MA0330 # 03 Y:1995 | 03 | 1995 | USE RADIANT HEATER FOR SPOT HEATING | $21,840 | $3,800 | Not Implemented |
MA0330 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $861 | $0 | Not Implemented |
MA0330 # 05 Y:1995 | 05 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $753 | $1,930 | Implemented |
MA0326 # 01 Y:1995 | 01 | 1995 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $26,014 | $2,700 | Not Implemented |
MA0326 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,865 | $288 | Not Implemented |
MA0326 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $4,443 | $7,770 | Implemented |
MA0326 # 04 Y:1995 | 04 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,604 | $4,305 | Implemented |
MA0326 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,293 | $2,500 | Implemented |
MA0326 # 06 Y:1995 | 06 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,920 | $0 | Not Implemented |
MA0326 # 07 Y:1995 | 07 | 1995 | INSTALL OCCUPANCY SENSORS | $946 | $986 | Not Implemented |
MA0326 # 08 Y:1995 | 08 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $653 | $836 | Implemented |
MA0325 # 08 Y:1995 | 08 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $255 | Implemented |
MA0325 # 09 Y:1995 | 09 | 1995 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $28,487 | $53,330 | Implemented |
MA0325 # 10 Y:1995 | 10 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $7,953 | $5,526 | Implemented |
MA0325 # 01 Y:1995 | 01 | 1995 | COVER OPEN TANKS | $3,618 | $1,883 | Implemented |
MA0325 # 02 Y:1995 | 02 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,067 | $4,632 | Not Implemented |
MA0325 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,545 | $2,500 | Not Implemented |