IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,553

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0096 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,442 $6,685 Implemented
HO0096 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $101 $417 Not Implemented
HO0096 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,178 $900 Not Implemented
HO0096 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,471 $1,000 Implemented
HO0096 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $695 $400 Not Implemented
HO0096 # 07 Y:1995 07 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $120 $141 Not Implemented
MA0330 # 01 Y:1995 01 1995 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $216,508 $0 Not Implemented
MA0330 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,739 $37,200 Not Implemented
MA0330 # 03 Y:1995 03 1995 USE RADIANT HEATER FOR SPOT HEATING $21,840 $3,800 Not Implemented
MA0330 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $861 $0 Not Implemented
MA0330 # 05 Y:1995 05 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $753 $1,930 Implemented
MA0326 # 01 Y:1995 01 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,014 $2,700 Not Implemented
MA0326 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,865 $288 Not Implemented
MA0326 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $4,443 $7,770 Implemented
MA0326 # 04 Y:1995 04 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,604 $4,305 Implemented
MA0326 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,293 $2,500 Implemented
MA0326 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,920 $0 Not Implemented
MA0326 # 07 Y:1995 07 1995 INSTALL OCCUPANCY SENSORS $946 $986 Not Implemented
MA0326 # 08 Y:1995 08 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $653 $836 Implemented
MA0325 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $255 Implemented
MA0325 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $28,487 $53,330 Implemented
MA0325 # 10 Y:1995 10 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $7,953 $5,526 Implemented
MA0325 # 01 Y:1995 01 1995 COVER OPEN TANKS $3,618 $1,883 Implemented
MA0325 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,067 $4,632 Not Implemented
MA0325 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,545 $2,500 Not Implemented