IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0078 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,026 $142,221 n/a
IC0078 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,252 n/a
IC0078 # 11 Y:2004 11 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $819 $920 n/a
IC0078 # 12 Y:2004 12 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,626 $955 n/a
IC0078 # 13 Y:2004 13 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $260 $0 n/a
IC0078 # 14 Y:2004 14 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $3,949 $750 n/a
OK0657 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $1,116 $722 Not Implemented
OK0657 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,220 $25 Implemented
OK0657 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,257 $320 Implemented
OK0657 # 04 Y:2003 04 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $16,000 $0 Not Implemented
OK0657 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,814 $11,574 Not Implemented
OK0657 # 06 Y:2003 06 2003 USE OPTIMUM THICKNESS INSULATION $3,894 $3,430 Not Implemented
OK0657 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,378 $7,500 Not Implemented
OK0657 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,624 $11,750 Implemented
OK0657 # 09 Y:2003 09 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $624,000 $10,149 Not Implemented
OK0656 # 01 Y:2003 01 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $10,706 $5,000 Not Implemented
OK0656 # 02 Y:2003 02 2003 DISCONNECT BALLASTS $3,785 $315 Not Implemented
OK0656 # 03 Y:2003 03 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $56,437 $28,000 Not Implemented
OK0656 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,663 $1,000 Not Implemented
OK0656 # 05 Y:2003 05 2003 INSTALL SET-BACK TIMERS $5,285 $2,340 Not Implemented
OK0656 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $659 $659 Not Implemented
OK0655 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $21,416 $543 Not Implemented
OK0655 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $1,300 Not Implemented
OK0655 # 03 Y:2003 03 2003 REPLACE BOILER $45,804 $53,815 n/a
OK0655 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,818 $30,499 Not Implemented