Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0999 # 01 Y:2019 | 01 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,762 | $0 | Not Implemented |
UD0999 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,453 | $0 | Implemented |
UD0999 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $6,465 | $596 | Not Implemented |
UD0999 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $4,677 | $353 | Not Implemented |
UD0999 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,669 | $11,170 | Not Implemented |
UD0998 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,128 | $0 | Not Implemented |
UD0998 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,093 | $0 | Not Implemented |
UD0998 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $10,815 | $2,500 | Not Implemented |
UD0998 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,888 | $40 | Not Implemented |
UD0998 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $280 | Not Implemented |
UD0998 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,189 | $3,500 | Not Implemented |
UD0998 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,380 | $1,315 | Not Implemented |
UD0998 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $5,000 | Not Implemented |
UD0998 # 09 Y:2019 | 09 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,344 | $2,520 | Not Implemented |
WV0579 # 01 Y:2019 | 01 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $95,486 | $76,000 | Not Implemented |
WV0579 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,379 | $3,500 | Implemented |
WV0579 # 03 Y:2019 | 03 | 2019 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $14,452 | $10,325 | Not Implemented |
WV0579 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,774 | $22,038 | Not Implemented |
WV0579 # 05 Y:2019 | 05 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,488 | $879 | Implemented |
WV0579 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,976 | $11,825 | Not Implemented |
WV0579 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,120 | $5,000 | Not Implemented |
WV0579 # 08 Y:2019 | 08 | 2019 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $889 | $1,460 | Not Implemented |
WV0579 # 09 Y:2019 | 09 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $589 | $1,000 | Implemented |
WV0579 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $346 | $33 | Implemented |
WV0578 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $49,796 | $9,417 | Not Implemented |