IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0105 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,370 $0 Not Implemented
UU0105 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,340 $3,385 Not Implemented
UU0105 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $430 Not Implemented
UU0105 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $440 $170 Not Implemented
UU0105 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $3,000 $2,300 Not Implemented
UU0105 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,980 $4,365 Not Implemented
UU0105 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $15,140 $40,000 Not Implemented
UU0104 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,040 $10,000 Not Implemented
UU0104 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $2,420 $2,000 Not Implemented
UU0104 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,540 $3,530 Not Implemented
UU0104 # 04 Y:2006 04 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $104,490 $16,800 Not Implemented
UU0104 # 05 Y:2006 05 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $198,120 $1,974,210 Not Implemented
UU0104 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,650 $28,400 Not Implemented
UU0104 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $3,510 $8,490 Not Implemented
UU0103 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $1,995 Not Implemented
UU0103 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $560 $25 Not Implemented
UU0103 # 03 Y:2006 03 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,760 $212 Not Implemented
UU0103 # 04 Y:2006 04 2006 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $47,500 $23,700 Not Implemented
UU0103 # 05 Y:2006 05 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,510 $5,000 Not Implemented
UU0103 # 06 Y:2006 06 2006 PAY BILLS ON TIME TO AVOID LATE FEES $706 $0 Not Implemented
UU0103 # 07 Y:2006 07 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $50 $115 Not Implemented
UU0103 # 08 Y:2006 08 2006 INSTALL SPECTRAL REFLECTORS / DELAMP $730 $6,080 Not Implemented
UU0102 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $88,420 $3,500 Implemented
UU0102 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $4,040 Implemented
UU0102 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $620 Not Implemented