IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0238 # 12 Y:2003 12 2003 PURCHASE EQUIPMENT INSTEAD OF LEASING $93,048 $395,000 Not Implemented
BD0238 # 13 Y:2003 13 2003 AUTOMATE PAYROLL SYSTEM $2,808 $7,000 Not Implemented
WV0279 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $4,123 $2,300 Implemented
WV0279 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,327 $15,420 Implemented
WV0279 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,812 $20,095 Implemented
WV0279 # 03 Y:2003 03 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $11,747 $700 Implemented
WV0279 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $9,443 $2,540 Implemented
WV0279 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,983 $165 Not Implemented
WV0279 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,685 $510 Implemented
WV0279 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,474 $1,400 Not Implemented
WV0279 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,083 $70 Not Implemented
WV0279 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $135 Not Implemented
WV0279 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $260 Not Implemented
UM0243 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $142,452 $31,500 Implemented
UM0243 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $20,715 $4,565 Not Implemented
UM0243 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,928 $520 Implemented
UM0243 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $13,955 $6,000 Implemented
UM0243 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,857 $150 Implemented
UM0243 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,082 $100 Not Implemented
OR0436 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,500 $7,680 Implemented
OR0436 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,530 $0 Implemented
OR0436 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $3,000 Not Implemented
OR0436 # 04 Y:2003 04 2003 UPGRADE CONTROLS ON COMPRESSORS $8,380 $6,780 Implemented
OR0436 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $48,169 $66,400 Implemented
SU0167 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $839 $0 Implemented