IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0378 # 07 Y:2020 07 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,694 $1,195 Implemented
MI0378 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $1,344 $1,042 Not Implemented
MI0378 # 09 Y:2020 09 2020 USE PHOTOCELL CONTROLS $981 $1,141 Not Implemented
MI0378 # 10 Y:2020 10 2020 ISOLATE HOT OR COLD EQUIPMENT $671 $560 Not Implemented
MI0377 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,975 $1,980 Not Implemented
MI0377 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,215 $2,100 Not Implemented
MI0377 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,058 $1,306 Not Implemented
MI0377 # 04 Y:2020 04 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,560 $17,760 Not Implemented
MI0377 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,125 $2,048 Not Implemented
MI0377 # 06 Y:2020 06 2020 AIR CONDITION ONLY SPACE NECESSARY $1,976 $4,415 Not Implemented
MI0377 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,479 $1,875 Not Implemented
MI0377 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $1,242 $1,042 Not Implemented
MI0377 # 09 Y:2020 09 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,158 $1,827 Not Implemented
MI0377 # 10 Y:2020 10 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $744 $965 Not Implemented
MI0377 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $688 $682 Not Implemented
MI0376 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $234,414 $800 Not Implemented
MI0376 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $205,000 $1,013,224 Not Implemented
MI0376 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $55,477 $1,980 Not Implemented
MI0376 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,854 $580 Not Implemented
MI0376 # 05 Y:2020 05 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $6,695 $5,875 Not Implemented
MI0376 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,838 $9,120 Implemented
MI0376 # 07 Y:2020 07 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,944 $440 Not Implemented
MI0376 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $763 $289 Not Implemented
UF0554 # 01 Y:2020 01 2020 Install Anaerobic Digester $74,732 $250,000 Not Implemented
UF0554 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,805 $25,232 Implemented