IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0655 # 05 Y:2003 05 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,749 $25,000 Not Implemented
OK0645 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,346 $2,900 Not Implemented
OK0645 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,887 $220 Implemented
OK0645 # 03 Y:2002 03 2002 MODIFY WORKLOAD $10,443 $5,600 Not Implemented
OK0645 # 04 Y:2002 04 2002 MOVE PRODUCT USING MECHANICAL MEANS $22,600 $10,000 Not Implemented
OK0645 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $176 $163 Implemented
OK0645 # 06 Y:2002 06 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $61,280 $44,000 Implemented
OK0643 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $3,635 $558 Implemented
OK0643 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,012 $3,430 Not Implemented
OK0643 # 03 Y:2002 03 2002 MODIFY WORKLOAD $17,500 $2,500 Not Implemented
OK0643 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,163 $1,440 Implemented
OK0643 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $36,000 $384 Not Implemented
OK0643 # 06 Y:2002 06 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $117,500 $4,800 Implemented
OK0643 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,970 $300 Implemented
OK0644 # 01 Y:2002 01 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $190 $280 Not Implemented
OK0644 # 02 Y:2002 02 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $570 $3 Implemented
OK0644 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,441 $1,738 Implemented
OK0644 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,779 $5,835 Not Implemented
OK0644 # 05 Y:2002 05 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $223,374 $103,500 Not Implemented
OK0637 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $503 $2 Not Implemented
OK0637 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $91 $185 Implemented
OK0637 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,484 $0 Implemented
OK0637 # 04 Y:2002 04 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,814 $8,286 Implemented
OK0637 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,882 $630 Implemented
OK0636 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,565 $16,300 Implemented