IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0625 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,881 $0 Not Implemented
MA0625 # 05 Y:2007 05 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,964 $10,530 Implemented
MA0622 # 01 Y:2007 01 2007 BURN A LESS EXPENSIVE GRADE OF FUEL $1,852,277 $4,120,500 Implemented
MA0622 # 02 Y:2007 02 2007 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $653,801 $423,075 Implemented
MA0622 # 03 Y:2007 03 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $449,650 $250,000 Not Implemented
MA0622 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $337,840 $694,400 Implemented
MA0622 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $67,981 $60,600 Not Implemented
MA0622 # 06 Y:2007 06 2007 UPGRADE OBSOLETE EQUIPMENT $34,468 $111,500 Implemented
MA0622 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $21,165 $10,000 Implemented
MA0622 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,919 $30,500 Not Implemented
MA0616 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,636 $132,834 Not Implemented
MA0616 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,128 $3,725 Not Implemented
MA0616 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,603 $2,550 Implemented
MA0616 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $37,450 $12,998 Not Implemented
MA0616 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $16,346 $1,088 Not Implemented
MA0616 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $709 $300 Not Implemented
MA0615 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,604 $84,300 Implemented
MA0615 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,050 $100,800 Not Implemented
MA0615 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,125 $0 Implemented
MA0615 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,561 $53,848 Not Implemented
MA0615 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,214 $800 Implemented
MA0615 # 06 Y:2007 06 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,518 $13,000 Implemented
MA0615 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $8,155 $0 Implemented
MA0615 # 08 Y:2007 08 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,499 $15,500 Not Implemented
MA0615 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $4,673 $18,500 Implemented