Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0625 # 04 Y:2007 | 04 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,881 | $0 | Not Implemented |
MA0625 # 05 Y:2007 | 05 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,964 | $10,530 | Implemented |
MA0622 # 01 Y:2007 | 01 | 2007 | BURN A LESS EXPENSIVE GRADE OF FUEL | $1,852,277 | $4,120,500 | Implemented |
MA0622 # 02 Y:2007 | 02 | 2007 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $653,801 | $423,075 | Implemented |
MA0622 # 03 Y:2007 | 03 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $449,650 | $250,000 | Not Implemented |
MA0622 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $337,840 | $694,400 | Implemented |
MA0622 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $67,981 | $60,600 | Not Implemented |
MA0622 # 06 Y:2007 | 06 | 2007 | UPGRADE OBSOLETE EQUIPMENT | $34,468 | $111,500 | Implemented |
MA0622 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,165 | $10,000 | Implemented |
MA0622 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,919 | $30,500 | Not Implemented |
MA0616 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,636 | $132,834 | Not Implemented |
MA0616 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,128 | $3,725 | Not Implemented |
MA0616 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,603 | $2,550 | Implemented |
MA0616 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $37,450 | $12,998 | Not Implemented |
MA0616 # 05 Y:2007 | 05 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $16,346 | $1,088 | Not Implemented |
MA0616 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $709 | $300 | Not Implemented |
MA0615 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,604 | $84,300 | Implemented |
MA0615 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,050 | $100,800 | Not Implemented |
MA0615 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,125 | $0 | Implemented |
MA0615 # 04 Y:2007 | 04 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,561 | $53,848 | Not Implemented |
MA0615 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,214 | $800 | Implemented |
MA0615 # 06 Y:2007 | 06 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,518 | $13,000 | Implemented |
MA0615 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,155 | $0 | Implemented |
MA0615 # 08 Y:2007 | 08 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,499 | $15,500 | Not Implemented |
MA0615 # 09 Y:2007 | 09 | 2007 | OPTIMIZE PLANT POWER FACTOR | $4,673 | $18,500 | Implemented |