IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0444 # 08 Y:2012 08 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,593 $1,555 Not Implemented
WV0444 # 09 Y:2012 09 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,548 $0 Implemented
WV0444 # 10 Y:2012 10 2012 DEVELOP A REPAIR/REPLACE POLICY $1,353 $838 Implemented
WV0444 # 11 Y:2012 11 2012 RECOVER WASTE HEAT FROM EQUIPMENT $247 $290 Not Implemented
WV0442 # 01 Y:2012 01 2012 USE RADIANT HEATER FOR SPOT HEATING $12,851 $21,250 Not Implemented
WV0442 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,605 $46,000 Not Implemented
WV0442 # 03 Y:2012 03 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,204 $8,000 Not Implemented
WV0442 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,540 $24,996 Implemented
WV0442 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,141 $834 Implemented
WV0442 # 06 Y:2012 06 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $3,725 $10,260 Implemented
WV0442 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,772 $8,303 Not Implemented
WV0442 # 08 Y:2012 08 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,662 $4,000 Implemented
WV0442 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,406 $1,900 Not Implemented
WV0442 # 10 Y:2012 10 2012 OPTIMIZE PLANT POWER FACTOR $1,268 $6,650 Not Implemented
WV0442 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $1,051 $644 Implemented
WV0442 # 12 Y:2012 12 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $1,050 Implemented
WV0439 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,687 $83,338 Not Implemented
WV0439 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,688 $48,160 Not Implemented
WV0439 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,442 $26,920 Not Implemented
WV0439 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $23,664 $1,202 Implemented
WV0439 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $22,385 $30,600 Not Implemented
WV0439 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,648 $4,000 Implemented
WV0439 # 07 Y:2011 07 2011 IMPROVE LUBRICATION PRACTICES $12,205 $8,311 Not Implemented
WV0439 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,735 $96 Implemented
WV0439 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,194 $468 Implemented