IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0145 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $632 $600 Implemented
BD0145 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $408 $890 Implemented
BD0145 # 06 Y:1999 06 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $11,371 $31,000 Not Implemented
BD0145 # 07 Y:1999 07 1999 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $3,002 $11,500 Not Implemented
BD0145 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $125,756 $200,000 Implemented
BD0145 # 09 Y:1999 09 1999 INCREASE USE OF AUTOMATION $6,149 $26,000 Not Implemented
CO0449 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,410 $66,360 Implemented
CO0449 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,830 $10,000 Implemented
CO0449 # 03 Y:1999 03 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,030 $500 Not Implemented
CO0449 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $280 Implemented
CO0449 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60 $0 Implemented
CO0449 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $18,110 $3,600 Implemented
CO0449 # 07 Y:1999 07 1999 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $2,550 $1,100 Implemented
CO0449 # 08 Y:1999 08 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,160 $3,300 Implemented
CO0449 # 09 Y:1999 09 1999 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $8,960 $620 Implemented
CO0450 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,280 $60,960 Not Implemented
CO0450 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $15,000 Implemented
CO0450 # 03 Y:1999 03 1999 PURCHASE APPROPRIATELY SIZED MATERIAL $1,580 $0 Not Implemented
IA0233 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,988 $5,439 Not Implemented
IA0233 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,239 $0 Not Implemented
IA0233 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $45 Implemented
IA0233 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,355 $0 Not Implemented
IA0233 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,757 $2,000 Implemented
IA0233 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $314 $60 Not Implemented
KU0529 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $660 $190 Not Implemented