IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0310 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,954 $340 Not Implemented
UF0310 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $57,004 $97,500 Not Implemented
UF0310 # 03 Y:2002 03 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $27,021 $84,100 Not Implemented
UF0310 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,473 $10,800 Not Implemented
UF0310 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,134 $32,723 Not Implemented
UF0310 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,828 $1,339 Not Implemented
UF0310 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,038 $0 Not Implemented
UF0310 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,690 $19,381 Not Implemented
UF0310 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,920 $1,895 Not Implemented
IA0300 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $316 Implemented
IA0300 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $616 Implemented
IA0300 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $381 Implemented
IA0300 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,567 Not Implemented
IA0300 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $834 $1,264 Not Implemented
IA0300 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,935 $279 Not Implemented
IA0300 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,830 $960 Implemented
SF0244 # 01 Y:2002 01 2002 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $31,136 $7,960 Not Implemented
SF0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $107,810 $50,000 Implemented
SF0244 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,936 $19,350 Not Implemented
SF0244 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $31,494 $16,627 Implemented
SF0244 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $2,185 $1,200 Not Implemented
SF0244 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,304 $4,110 Implemented
SF0244 # 07 Y:2002 07 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,274 $17,580 Implemented
SF0244 # 08 Y:2002 08 2002 REDUCE EXCESSIVE BOILER BLOWDOWN $6,671 $6,000 Implemented
SF0244 # 09 Y:2002 09 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,672 $2,500 Not Implemented