IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0167 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $633 $0 Not Implemented
SU0167 # 03 Y:2003 03 2003 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $8,152 $147 Not Implemented
SU0167 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,750 $214 Not Implemented
SU0167 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $603 $116 Not Implemented
SU0167 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $6,319 $5,775 Not Implemented
NC0265 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,793 $7,000 Implemented
NC0265 # 02 Y:2003 02 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,226 $24,506 Implemented
NC0265 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,348 $3,525 Implemented
NC0265 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,206 $1,100 Not Implemented
NC0265 # 05 Y:2003 05 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $7,094 $1,000 Implemented
NC0265 # 06 Y:2003 06 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,361 $0 Implemented
NC0265 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,469 $300 Implemented
NC0265 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $214 $50 Implemented
NC0265 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $100 $89 Implemented
IA0328 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $107 $145 Implemented
IA0328 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,948 $254 Implemented
IA0328 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $71 Implemented
IA0328 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,591 $17,302 Implemented
IA0328 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $636 $827 Implemented
IA0328 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $120 $333 Not Implemented
IA0328 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $446 $1,365 Not Implemented
IA0328 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $572 $1,552 Not Implemented
IA0328 # 09 Y:2003 09 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,701 $23,701 Implemented
LE0164 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,136 $150 Not Implemented
LE0164 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,194 $4,000 Not Implemented