Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0562 # 05 Y:2016 | 05 | 2016 | DISCONNECT BALLASTS | $2,687 | $980 | Not Implemented |
IA0562 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,171 | $2,324 | Not Implemented |
IA0562 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $721 | $1,740 | Implemented |
UM0472 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,171 | $1,000 | n/a |
UM0472 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,743 | $18,830 | n/a |
UM0472 # 03 Y:2016 | 03 | 2016 | ADD AREA LIGHTING SWITCHES | $22,157 | $2,680 | n/a |
UM0472 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,915 | $12,000 | n/a |
SD0537 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,109 | $108,180 | Not Implemented |
SD0537 # 02 Y:2016 | 02 | 2016 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $21,873 | $21,829 | Not Implemented |
SD0537 # 03 Y:2016 | 03 | 2016 | OPTIMIZE PLANT POWER FACTOR | $10,293 | $10,000 | Not Implemented |
SD0537 # 04 Y:2016 | 04 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $9,320 | $22,960 | Not Implemented |
SD0537 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,406 | $10,314 | Implemented |
SD0537 # 06 Y:2016 | 06 | 2016 | REDUCE HEAT GAIN BY WINDOW TINTING | $2,089 | $7,880 | Not Implemented |
SD0537 # 07 Y:2016 | 07 | 2016 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,758 | $5,550 | Not Implemented |
SD0537 # 08 Y:2016 | 08 | 2016 | USE PHOTOCELL CONTROLS | $1,432 | $4,070 | Not Implemented |
SD0537 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $1,312 | $3,610 | Implemented |
SD0537 # 10 Y:2016 | 10 | 2016 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,205 | $2,550 | Not Implemented |
WV0532 # 01 Y:2016 | 01 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $35,091 | $2,025 | Not Implemented |
WV0532 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,778 | $25,000 | Not Implemented |
WV0532 # 03 Y:2016 | 03 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $7,492 | $18,550 | Not Implemented |
WV0532 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,128 | $0 | Implemented |
WV0532 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,095 | $730 | Implemented |
WV0532 # 06 Y:2016 | 06 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,845 | $2,675 | Implemented |
WV0532 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,284 | $552 | Implemented |
WV0532 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $884 | $158 | Implemented |